Zhengzhou Fude Machinery Equipment Co., Ltd. is a professional enterprise engaged in the research and development and production of equipment such as wood crushers, template crushers, mobile comprehensive crushers, sawdust machines, biomass pellet machines, etc. Not only has the production technology and product quality and appearance been improved, but also a large amount of experience has been accumulated. Based on fair prices, excellent production, comprehensive after-sales service, we have won praise from domestic and foreign customers.The branch crusher is a fast, affordable, and wood crushing and processing equipment. The appearance of the finished product can be freely adjusted from sawdust, granular to flake shape. The wood crusher can process pine, miscellaneous wood, poplar, fir, and raw bamboo. Due to its compact structure, small footprint, good cutting quality, low power consumption, and suitable for mobile operations, the branch crusher is suitable for the material preparation section of small and medium-sized particle board and fiberboard production enterprises, and can also be used for the production of commercial wood chips by individual households.
Product Advantages:
1. The branch crusher can produce biomass burning particles from trimmed leaf branches, which can be used as new fuel for fryers, thermal power plants, household heating, and more.
2. The sawdust after being crushed by a branch crusher can be used to cultivate edible mushrooms, which can increase the mushroom yield and increase the maximum yield by 3.2 times.
3. The branch crusher crushes the sawdust particles from the pruned wood branches into organic fertilizers and cultivates other trees.
Maintenance of Branch Crusher
1. If the rivet head of the impeller is worn out, the worn rivet head can be restored to its original normal state by pressing the impeller body tightly and welding it with the wheel hub.
2. For situations where fatigue cracks are prone to occur at the rivet hole, a new welding rod that has not been used can be used to repair the cracks. However, the welding rod should be symmetrically centered around the impeller axis. The remaining welding rod at the crack should be left there, and a new welding rod should be used to repair the corresponding rivet hole cracks. After welding, the remaining welding rod should be the same length as the welding rod left when repairing the symmetrical rivet, to ensure equal weight when welding. If there are no cracks at the symmetrical rivet hole, the welding rod should also be deposited here to offset the newly added welding weight at the symmetrical rivet hole crack. Welding according to this symmetrical weighting method can repair cracks.
3. The method of conducting a simple dynamic balance test on the impeller is also very simple. After supporting the impeller, use your hand to gently rotate it. If the balance cannot be reached, it will stop at the lowest point and swing left and right. If there is a bias, spot welding can be carried out on the opposite impeller to increase its weight and balance it, or the welding marks on the bias impeller can be removed with an angle grinder to achieve balance, so that the fan can be repaired for normal operation. Note that during the repair process of the fan, spot welding should not be used arbitrarily. The welding marks should be left on the impeller to avoid affecting the balance of the fan impeller and failing to achieve the repair goal, resulting in greater losses.
Zhengzhou Fude Machinery Equipment Co, Ltd,Established in 2015,A factorythat integrates machine research, development, manufacturing, and sales,Main production: metal briquetting machines, wood crushers,Organic fertilizer production line and large andmedium-sized equipment for dryers
Service tenet:Integrity based management, To ensure quality control,Satisfy both parties
FAQ
Q:Are you a trading company or a manufacturing factory?
A:We are a factory.
Q:What is your delivery time?
A:If the goods are in stock, it usually takes 7-10 days. If the goods are out of stock, it will take 15 to 30 days, calculated by quantity.
Q:What is your payment method?
A:30% of the total price should be paid in T/T as the down payment; 70% of the remaining payment should be paid in T/T before delivery.
Q:Do you provide technical guidance?
A:Yes, we will provide you with professional advice on theselection of models and the operation of equipment.