After-sales Service: | Support Customization |
---|---|
Warranty: | 12 Months |
Movement Way: | Drum-Type |
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Application field The drum dryer consists of two main parts: a box body and a drum. The main body adopts a reverse flow tower type internal circulation structure, with an overall modular structure, easy to disassemble and transport, small footprint, good drying quality, low labor operation intensity, and low equipment cost. The heating system is integrated with the drum design, with a compact structure, low energy consumption, and high thermal efficiency. The small dryer is in line with the concept of continuously improving material drying quality, reducing energy consumption, and reducing losses, and is in line with the principles of green, high-quality, and fresh drying. 1. It can be widely used for drying materials in the fields of river sand, sludge, coal mud, sawdust, sand, tofu dregs, chicken manure, Manure, feed, Chinese medicine dregs, distiller's grains, vinegar dregs, etc; 2. Using hot air as the drying medium and adopting a circular drying process, the material undergoes uniform and sufficient precipitation during heating, resulting in good quality after drying; 3. The heating system of the dryer is more advanced, and the converted heat energy dries the materials; 4. Equipped with automatic online temperature and humidity measurement devices, the automation level is greatly improved, and the drying uniformity is high; 5. It can automatically control the working process, automatically stop the machine, and operate easily and labor-saving, greatly reducing labor costs. 6. Diversified heating methods, such as electric heating, coal-fired heating, gas heating, biomass particle heating, etc. |
FAQ Q:Are you a trading company or a manufacturing factory? A:We are a factory. Q:What is your delivery time? A:If the goods are in stock, it usually takes 7-10 days. If the goods are out of stock, it will take 15 to 30 days, calculated by quantity. Q:What is your payment method? A:30% of the total price should be paid in T/T as the down payment; 70% of the remaining payment should be paid in T/T before delivery. Q:Do you provide technical guidance? A:Yes, we will provide you with professional advice on the selection of models and the operation of equipment. |
Suppliers with verified business licenses