------ Metal briquetting machine ------
Metal briquetting machine, iron wire aluminum profile leftover material packaging machine, supporting customization, is a multi-purpose waste metal briquetting machine (packaging machine). The metal is compressed and packaged to reduce its volume, making it easy to load and box, and more importantly, to improve the melting rate. The compression pressure of the main cylinder of the scrap metal briquetting machine ranges from 100 tons to 500 tons, and the motor power ranges from 30 kW to 185 kW We have many years of experience in design and production manufacturing, and enjoy a high reputation in the design of hydraulic systems.
------ Working principle ------
Place the materials that need to be packaged and formed in the metal forming machine material box, use hydraulic oil cylinders to push and compress the materials that need to be packaged in the material box, and ultimately form various styles and sizes of packaging blocks, which are formed in one go and convenient for transportation.
------ Product Features ------
1. All models are hydraulically driven, with the option of manual operation or PLC automatic control.
2. There are various ways to release packages, such as flipping, side pushing, forward pushing, and manual pickup.
3. Multiple models are available for selection: different pressures, forming sizes, and shapes.
------ Customer site ------
------ Scope of application ------
------ Different material forming effects ------
------ Product display ------
Zhengzhou Fude Machinery Equipment Co, Ltd,Established in 2015,A factorythat integrates machine research, development, manufacturing, and sales,Main production: metal briquetting machines, wood crushers, and large andmedium-sized equipment for dryers.
Service tenet:Integrity based management, To ensure quality control,Satisfy both parties. |
FAQ
Q:Are you a trading company or a manufacturing factory?
A:We are a factory.
Q:What is your delivery time?
A:If the goods are in stock, it usually takes 7-10 days.
If the goods are out of stock, it will take 15 to 30 days, calculated by quantity.
Q:What is your payment method?
A:30% of the total price should be paid in T/T as the down payment; 70% of the remaining payment should be paid in T/T before delivery.
Q:Do you provide technical guidance?
A:Yes, we will provide you with professional advice on the selection of models and the operation of equipment.