Product Introduction:
The gantry shear machine has a compact structure and a box shaped structure welded with steel plates, ensuring stable mechanical performance. The shear cylinder body is connected with a ball joint, which improves the stability and service life of the cylinder, adds a front plate guide device, and improves the stress condition of the entire machine. Adopting electro-hydraulic control, it is easy to operate and can achieve automatic circulation of inching and linkage. It is one of the ideal equipment for metal recycling industry and casting workshop material processing.
Product advantages:
1. Add a high-pressure filter to the hydraulic system. The hydraulic oil needs to pass through a high-pressure filter before entering the pipeline and hydraulic control valve. (High pressure filter comes with alarm)
2. Independent air cooling: This machine adopts a high air flow air cooling machine to control the oil temperature of the hydraulic oil within the normal range of use. At the same time, the air-cooled machine solves the problem of inconvenient water sources due to the occupied area of the water cooler.
3. PLC manual automatic control box. Can achieve manual and automatic replacement. Equipped with a remote control for remote start, stop, and automatic operation.
4. Pushing groove with pressure cover: It can achieve automatic feeding and simultaneously push the material along the pressure cover to the main cutting machine for cutting.
5. Connecting device at the front end of the cylinder rod. Effectively protect the cylinder rod from damage.
Product display:
Hydraulic gantry shear machine is suitable for materials:
Cutting effect:
Zhengzhou Fude Machinery Equipment Co, Ltd,Established in 2015,A factorythat integrates machine research, development, manufacturing, and sales,Main production: metal briquetting machines, wood crushers, and large andmedium-sized equipment for dryers.
Service tenet:Integrity based management, To ensure quality control,Satisfy both parties.
FAQ
Q:Are you a trading company or a manufacturing factory?
A:We are a factory.
Q:What is your delivery time?
A:If the goods are in stock, it usually takes 7-10 days.
If the goods are out of stock, it will take 15 to 30 days, calculated by quantity.
Q:What is your payment method?
A:30% of the total price should be paid in T/T as the down payment; 70% of the remaining payment should be paid in T/T before delivery.
Q:Do you provide technical guidance?
A:Yes, we will provide you with professional advice on the selection of models and the operation of equipment. |